Paul Summers

Planning Strategies

Home Page

Client Page

Contact Us

Cooloola-Great Sandy EcoCentre

Key Services & Capability

Maleny Community Groups

Paul’s Planning Proclamations

PIA Sunshine Coast

Presentations & Publications

QUT

Search PSPS

Site Map

SunPlan

What the Press Have to Say

What’s New?

 

 

Paul Summers Planning Strategies: Cooloola-Great Sandy EcoCentre Page

(1)     This page is arranged the following way:

(a)     Meeting Process & Outcomes (last 12 months) (last updated 03/07/2008)

(b)     EcoCentre Plans (last updated 15/05/2008)

(c)     Exhibition Design (last updated 08/07/2008)

(d)     Stories (last updated 23/01/2007)

(e)     Governance & Operations (last updated 23/04/2008)

(f)      Meeting Processes & Outcomes (older than 12 months)

(2)     Documents are loaded in reverse date order within each section above. They are generally not password protected.

(3)     Some documents may be works-in-progress so can change from day to day (refer to the date column and the dates in the footers of the documents).

(4)     Some acronyms are used:

(a)     CAG: Community Advisory Group

(b)     ECMC: EcoCentre Management Committee

(c)     VCWG: Visitor Centre Working Group now transitioned to the CAG.

 

DATE

DOCUMENT

SIZE

TYPE

PAGES

STATUS

UPDATE COMMENTS

Meeting Processes & Outcomes (last 12 months)

03/07/2008

Action List ECMC 24/06/2008

0.03MB

pdf

2

Final

 Prepared by Lucie McCann, updated over 02/07/2008 version

15/05/2008

Action List ECMC 13/05/2008

0.05MB

pdf

2

Final

 

23/04/2008

Action List ECMC 10/04/2008

0.05MB

pdf

2

Final

 

19/03/2008

Action List ECMC 17/03/2008

0.05MB

pdf

2

Final

 

EcoCentre Plans

15/05/2008

External & Internal Perspectives

0.97MB

pdf

10

Final

Derived from 3D modelling

12/05/2008

Simple Floor Plan (construction)

0.26MB

pdf

1

Final

Updated with revised tenancy details and lighter, clearer colouring

30/03/2008

Detail Design Plans (construction)

12.67MB

pdf

30

Final

Construction plans

02/09/2007

Application approved by Council in August 2007:

 

IDAS application

4.81MB

pdf

91

Final

Incorporating IDAS application, planning report and design and sustainability report and reduced versions of some of the plans.

 

Perspective

1.53MB

pdf

1

Final

This rendering sees the EcoCentre dropped into a photograph of the site at actual scale.

 

Beach Road view

1.63MB

pdf

1

Final

This rendering sees the EcoCentre dropped into a photograph of the site at actual scale.

Exhibition Design

30/06/2008

Exhibition Design Plan

1.29MB

pdf

18

Work-in-progress

30/06/2008

Timeline

0.31MB

pdf

13

Work-in-progress

6th edition